Making Progress

Many of you have heard now that I am working on a new art installation called “That Wall”.There is 4 major steps to this installation as there is 2 sides and a sound track involved.The Graffiti wall is done !!! I have 4 more art dolls to do and going in to The Music Room in Powell River B.C. to record the soundtrack on Jan.15th with my new band called The Other-Side consisting of collaboration of artists/musicians together for the soul purpose of creating a soundtrack to go with the art installation.(I well introduce them soon I promise).The 4th step is to assemble the installation which well happen in February.In the mean time I leave you with a photo of preparing my Polymer Clay for the last 4 art dolls that well occupy The Other-Side of That Wall.

IMG_1543

One comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s